Road base & sub base
Gravel-and-fines blend that compacts to a hard, load-bearing layer for roads, yards and hardstanding. Supplied to municipal specs, with leveling, watering and compaction on request.
- 1,800–2,700M³ SUPPLIED PER DAY
- 3 / 20 / 45M³ LOAD SIZES AVAILABLE
- Since 2015SUPPLYING UAE CONTRACTORS
- Not a traderWE CRUSH, WASH AND HAUL IT
01 — The material
Compacts to a hard, load-bearing layer.
Road base is a blend of gravel and fine material that, once watered and compacted, forms a hard surface with high mechanical strength. It is the main structural layer under a road, yard or hardstanding.
Sub base is the aggregate layer laid on the subgrade, beneath the base course. It can be left out under foot traffic but is needed anywhere vehicles run. We supply both in bulk to any location in the UAE.
We can also level, water and compact the material we supply, and it is produced to Abu Dhabi Municipality, Al Ain Municipality, DOT, RTA and Ministry of Public Works standards.
02 — Specification
Road base technical specification
| MATERIAL | Crushed gravel / fines road base |
|---|---|
| GRADING | 0 – 40 mm gap-graded |
| MIX RATIO | 60/40 or 80/20 sand-to-stone |
| STANDARDS | ADM · Al Ain · DOT · RTA · MoPW |
| BULK DENSITY | ≈ 2.0 t / m³ loose |
| ON SITE | Leveling, watering & compaction available |
| SUPPLY FORM | Bulk tipper loads · minimum 20 m³ |
Indicative values. Confirm against your project spec sheet before ordering.
03 — Where it is used
Road base uses
- Road sub-layerBase course for roads
- Temporary roadwaysSite haul roads
- Land stabilisationGround build-up
- Temporary parkingCompacted hardstanding
- Site flooringEvents and yards
- HardstandingPlant and storage areas
- Compacted baseUnder slabs
- Pavement baseUnder interlock and asphalt
04 — The material, on site









05 — How many trucks?
Work out the loads before you call.
Enter the volume you need. We will show the load mix and the approximate tonnage so the conversation starts at the right place.
- Pickup tipper · 3 m³MITSUBISHI FUSO CANTER7
- 6-wheel tipper · 20 m³SCANIA P4101
- 3-axle trailer · 45 m³NEEDS ≥ 45 M³ FOR A TRAILER—
- Approximate weightAT ≈ 2 T / M³ LOOSE32 t
06 — Delivery
Two yards, our own trucks, no brokers in between.
- Dubai · Ras Al Khor, Al Quoz, Nad Al Sheba SAME DAY
- Jebel Ali & Dubai South SAME DAY
- Sharjah · Al Sajaa SAME DAY
Dubai — head office
5 16A Street, Ras Al Khor Industrial Area 1 Get directions →Sharjah — storage yard
Area S Plot 455, Al Sajaa Get directions →07 — The fleet that brings it
-
Pickup tipperMITSUBISHI FUSO CANTER
3 M³ / LOAD -
6-wheel tipperSCANIA P410
20 M³ / LOAD -
3-axle trailerMERCEDES-BENZ ACTROS
45 M³ / LOAD
08 — Questions we get every week
What is road base used for?
The main compacted structural layer under roads, yards, hardstanding and temporary access. Sub base sits below it on the subgrade.
What size and mix is it?
0–40 mm gap-graded, in a 60/40 or 80/20 sand-to-stone ratio, produced to ADM, Al Ain, DOT, RTA and MoPW standards.
Can you compact it on site?
Yes — we offer leveling, watering and compaction for the road base we supply.
What is the minimum order?
Road base moves in bulk — 20 m³ on a six-wheeler, or 45 m³ on a trailer for larger areas.
09 — Get a price
Send the quantity and the drop location.
Fill in the form and we’ll quote back the same day — or call and we’ll price it on the spot.
Closed Sundays
17:00–20:00